Seeking industry feedback on temporary ends of water mains
Problem statement: Unitywater wants to ensure the age of water in water mains is as low as possible to maintain Unitywater's high water quality standards.
Temporary ends of water mains are a concern when they exceed 2m.
Section 5.10.2 of the Seq code requires the water agency to define the requirement for temporary dead end mains.
Questions:
- How does Unitywater maintain water quality standards without stipulating that the need dead-end water mains not to exceed 2m?
- What does other service providers you work with do?
- What should be defined as temporary?
- What is the Seq code missing, e.g., the standard drawings are they missing anything?
- How should we communicate changes or updates in the future?
3 comments