New life for Waraba’s felled tree logs
More than 20 felled tree logs from the Waraba Wastewater Network Project have been repurposed to help rehabilitate the Caboolture River. The logs are being used as part of Unitywater’s Caboolture River Nutrient Offset Project, which is reducing nutrient flow into the river by stabilising the riverbanks and preventing erosion.
The project works in three key ways: forming a stable bank profile through earthworks, installing log groins to reduce the movement of sediment, and stabilising soil through vegetation planting.
We are delighted our Waraba felled tree logs have been given new life and are playing a part in protecting this vital waterway.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends